Field Manager Resume
Posted on: 2012-05-07
LOG IN OR REGISTER TO CONTACT ME
This button will open the login/register page in a new tab. After logging in, come back to this page and refresh your browser.
Resume:
NAME: Frantisek Ruzicka
\\r\\n
\\r\\n
LANGUAGE: English, Russian, Czech
\\r\\n
\\r\\n
NATIONALITY: Czech
\\r\\n
\\r\\n
\\r\\n
\\r\\n
Employment History:
\\r\\n
\\r\\n
December – so far
\\r\\n
NSN, Azerbaijan
\\r\\n
Azerfone SWAP and extension project
\\r\\n
G support, Field Manager
\\r\\n
\\r\\n
\\r\\n
- Reporting to Project manager
\\r\\n
- Managing of field activities as SWAP, implementation of SWAP sites
\\r\\n
- Managing of supervisors for clean up, SWAP
\\r\\n
- Creation of SWAP plans
\\r\\n
- SWAP
\\r\\n
\\r\\n
\\r\\n
\\r\\n
March – October
\\r\\n
NSN, Sweden
\\r\\n
Telenor SWAP project
\\r\\n
Field Manager
\\r\\n
\\r\\n
\\r\\n
- Reporting to Roll out and Project manager
\\r\\n
- Weekly, daily customer meetings
\\r\\n
- Weekly ,daily subcontractor meetings
\\r\\n
- Managing of field activities as SWAP, installation,TSS
\\r\\n
- Close cooperation with transmission and RF planning
\\r\\n
- Approving of subcontractors PO
\\r\\n
- Approving of TSSRs, Site folders
\\r\\n
- Approving of weekly swap plans, adjusting of the plans
\\r\\n
- Updating IPM on daily bases
\\r\\n
- G flexi BTS, Ericsson TN on IP network
\\r\\n
- Logistic of material for swap with DOP
\\r\\n
- Implementation of EHS management and control
\\r\\n
\\r\\n
\\r\\n
\\r\\n
January – December th
\\r\\n
NSN, Nigeria
\\r\\n
Regional BSS manager
\\r\\n
CW regional manager
\\r\\n
CW and TI Supervisor (new and old sites)
\\r\\n
\\r\\n
\\r\\n
- Reporting to CW country manager
\\r\\n
- Managing of supervisor
\\r\\n
- Customer meetings
\\r\\n
- responsibility for PAC, refueling, clean up of sites
\\r\\n
- Subcontractor meetings
\\r\\n
- Updating of E-PM
\\r\\n
- Regional BSS manager
\\r\\n
- following PAC,
\\r\\n
- responsible for refueling all the sites in NSN region
\\r\\n
- responsible for managing of all supervisor in region
\\r\\n
- responsible for managing all riggers
\\r\\n
- managing staff in region
\\r\\n
- managing of CW supervisors for sites under construction
\\r\\n
- managing of clean up of sites after PAC
\\r\\n
- ordering and cancelling cars for NSN staff
\\r\\n
- managing of databases
\\r\\n
- managing of maintenance of generators for all sites belongs to NSN roll out
\\r\\n
- managing of sites under construction, clean up, acceptance
\\r\\n
- sub cons
\\r\\n
- Kick-off meetings with customer and subcontractors
\\r\\n
- Building new sites
\\r\\n
- Checking the specifications of the sites
\\r\\n
- Weekly meetings with subcontractors
\\r\\n
- Controlling of Detail Design, correction, final drawings
\\r\\n
- Supervising of subcontractors on the sites
\\r\\n
- Quality checks
\\r\\n
- Final checking of sites, CAC acceptance, PAT acceptance
\\r\\n
- PISM
\\r\\n
- Updating E-PM
\\r\\n
- TSS
\\r\\n
- Flexi EDGE BTS(installation, commissioning, integration, cross connection, ABIS, troubleshooting)
\\r\\n
- Supervision of TI installation of Flexi EDGE BTS
\\r\\n
\\r\\n
\\r\\n
\\r\\n
\\r\\n
\\r\\n
\\r\\n
October – November
\\r\\n
Obelisk group, Ireland (Ericsson equipment)
\\r\\n
Commissioner (new and old links)
\\r\\n
\\r\\n
\\r\\n
- Installation and commissioning MINI-Link E,MINI-Link TN
\\r\\n
- LOS
\\r\\n
- Reports
\\r\\n
- EHS training,ISO&ISO standards
\\r\\n
- Implementation of EHS management and control
\\r\\n
\\r\\n
\\r\\n
\\r\\n
\\r\\n
May – August
\\r\\n
NSN, Iran
\\r\\n
TI Engineer and CW Supervisor
\\r\\n
\\r\\n
\\r\\n
- Reporting to upper management
\\r\\n
- Supervised and organized Subcontractors
\\r\\n
- Supervising and Quality control of the installation of BTS,MW,BSC
\\r\\n
- Commissioning and Integration of BTS and MW
\\r\\n
- Supervising of fiber connections
\\r\\n
- Supervising Antenna System installations and positions
\\r\\n
- Tracing materials order and deliveries to sites
\\r\\n
- Cross connections(HOP,BSC)
\\r\\n
- Supervised, Organized and reviewed the works orders
\\r\\n
- Organize equipment deliveries to sites
\\r\\n
- Site audit for the Sector directivity, antenna ground level, RF and Mini Link antenna installations, RF and ML cable path installations, connectors
\\r\\n
- RF Measurements of RF path for Base Station and Mini Link by Site Master Anritsu
\\r\\n
- Lead and supported the telecom implementation teams for the works of BTS, Mini Link and Power Supply commissioning and site integration on site
\\r\\n
- Technical interface to customer
\\r\\n
- Quality control check to prepare of Site Acceptance
\\r\\n
- Responsible for rehomings
\\r\\n
- Cell upgrade
\\r\\n
- Kick-off meetings with customer and subcontractors
\\r\\n
- Weekly meetings with subcontractors
\\r\\n
- Controlling of Detail Design, correction, final drawings
\\r\\n
- Supervising of subcontractors on the site
\\r\\n
- Quality checks
\\r\\n
- Final checking of sites, CAC acceptance, PAT acceptance
\\r\\n
- PISM
\\r\\n
\\r\\n
\\r\\n
July – September
\\r\\n
NSN, Bulgaria
\\r\\n
Field Engineer
\\r\\n
\\r\\n
\\r\\n
- Reporting to upper management
\\r\\n
- Site Surveys
\\r\\n
- Making SDDR
\\r\\n
- Nokia swap and G project
\\r\\n
- Supervising of subcontractors on the site
\\r\\n
\\r\\n
\\r\\n
\\r\\n
\\r\\n
- Final checks, acceptance of sites
\\r\\n
- Quality check
\\r\\n
- PISM
\\r\\n
- G training
\\r\\n
\\r\\n
\\r\\n
November –December
\\r\\n
NOKIA, Ukraine
\\r\\n
CW and TI Supervisor
\\r\\n
LOS Engineer
\\r\\n
\\r\\n
\\r\\n
- Reporting to project manager
\\r\\n
- Supervised and organized Subcontractors
\\r\\n
- Supervising and Quality control of the installation of BTS and MW
\\r\\n
- Supervising Antenna System installations and positions
\\r\\n
- Kick-off meetings with customer and subcontractors
\\r\\n
- Weekly meetings with subcontractors
\\r\\n
- Controlling of Detail Design, correction, final drawings
\\r\\n
- Supervising of subcontractors on the site
\\r\\n
- Quality checks
\\r\\n
- Final checking of sites, CAC acceptance, PAT acceptance
\\r\\n
- PISM
\\r\\n
- Reporting to TRS planners and project manager
\\r\\n
- LOS
\\r\\n
- Reporting, site survey, TRS plans
\\r\\n
\\r\\n
\\r\\n
January –December
\\r\\n
Ericsson Czech Republic
\\r\\n
TI&CW Supervisor, Team leader
\\r\\n
\\r\\n
\\r\\n
- Reporting to upper management
\\r\\n
- Supervised and Organized work orders
\\r\\n
- Attended and Reviewed the Site Surveys
\\r\\n
- Tracing the equipment deliveries to site
\\r\\n
- Supervised RBS Cabinet Installation, inspection of Feeder alignments and installations, inspection of Antenna orientation-sectors directivities, inspection and testing of AC and DC Supplies
\\r\\n
- Supervised Mini Link-E, Mini Link-TN Magazine and Cabling Installations, Outdoor unit installation and antenna alignment inspection
\\r\\n
- Have done the fallowing tests: Antenna System Test, RBS Site Installation Test, Mini Link-E and Mini Link-TN Functional and Performance Tests
\\r\\n
- Have responsible RBS ( Series) Commissioning and Integration, Mini Link-E and Mini Link-TN commissioning and bring to service
\\r\\n
- Led and Supported installation teams for technical work quality at site to prove ERICSSON Quality
\\r\\n
- Technical interface to customer
\\r\\n
- Cross connection on the links, BSC
\\r\\n
- Rehoming
\\r\\n
- DXX
\\r\\n
\\r\\n
\\r\\n
\\r\\n
\\r\\n
- Kick-off meetings with customer and subcontractors
\\r\\n
- Weekly meetings with subcontractors
\\r\\n
- Controlling of Detail Design, correction, final drawings
\\r\\n
- Supervising of subcontractors on the site
\\r\\n
- Quality checks
\\r\\n
- Final checking of sites, CAC acceptance, PAT acceptance
\\r\\n
- PISM
\\r\\n
\\r\\n
\\r\\n
Education and Qualifications:
\\r\\n
\\r\\n
Electrical Engineering College Pardubice, CZ
\\r\\n
Concentrated in Microwave, GSM and Telecommunications
\\r\\n
Software Skills: applications basis MS Office, AutoCAD
\\r\\n
Driving license:B
\\r\\n
\\r\\n
Professional Training:
\\r\\n
\\r\\n
\\r\\n
- Education Centre Sweden Certificate Ericsson
\\r\\n
- RBS -Installation Delta/Site Test
\\r\\n
- UltraSite BTS Installation & Commissioning: Nokia -
\\r\\n
- Node B commissioning training: Nokia
\\r\\n
- Radio Network Planning Principles
\\r\\n
- RF Measurement Applications, RF Loss & VSWR measurements using Site Master
\\r\\n
- MNI-LINK E, Traffic Node, High Capacity
\\r\\n
- RBS -Installation and Installation Verification
\\r\\n
- CCNA in View
\\r\\n
- Superior Performance in Team Leaders
\\r\\n
- In House Training on CDMA (X) Installation
\\r\\n
- Time and Priority Management
\\r\\n
- Flexi BTS
\\r\\n
- Implementation of IP network over Mini link TN
\\r\\n
- Installation, commissioning and integration of Nokia Flexi multiradio and G BS
\\r\\n